On Solid Ground
Jim Carter in the Foreground as we prepare to install 55 yards of concrete for the new driveway.

>>

Left to Right: Byron Shaw, Tom Stevens, Dean Robinson and Ed Wilkerson

<<

Left to Right Jim Carter, Steve Young, Chuck Abbot, Byron Shaw and Dean Robinson

>>

Visit the other photo galleries:

Volunteers stopped for one last picture before the final concrete pour

<<

New High Tech Leach Field for the Old School

>>

Let the Concrete Come
95 degrees that day

<<

Greg Conrad Left sizing up the situation

>>

Robin Conrad wife of Greg stops by to check on the progress

<<

New front door and Concrete handicapp access entrance.

>>

Preparing the ground for more concrete

<<

Almost finished.
The entire concrete project was completed in two weeks using all volunteer help.

>>

3 down and one pour to go.

<<

Paul Smith gets the edging just right while Bill Sherwood runs the Bull Float to smooth things out

>>

Construction begins on the tower next to the studio.

<<

Another 55 yards of concrete go into the base of the tower.

>>