| On Solid Ground |
|
|
|
|
|
|
|
|
Jim Carter in the Foreground as we prepare to install 55 yards of concrete for the new driveway.
>>
|
 |
|
 |
|
| Left to Right: Byron Shaw, Tom Stevens, Dean Robinson and Ed Wilkerson
<<
|
|
 |
|
Left to Right Jim Carter, Steve Young, Chuck Abbot, Byron Shaw and Dean Robinson
>>
|
|
|
Visit the other photo galleries:
|
|
 |
|
| Volunteers stopped for one last picture before the final concrete pour
<<
|
|
 |
|
|
New High Tech Leach Field for the Old School
>>
|
|
|
 |
|
Let the Concrete Come
95 degrees that day
<<
|
|
|
 |
|
|
|
Greg Conrad Left sizing up the situation
>>
|
|
|
 |
|
| Robin Conrad wife of Greg stops by to check on the progress
<<
|
|
|
 |
|
New front door and Concrete handicapp access entrance.
>>
|
|
|
 |
|
| Preparing the ground for more concrete
<<
|
|
|
 |
|
Almost finished.
The entire concrete project was completed in two weeks using all volunteer help.
>>
|
|
|
 |
|
| 3 down and one pour to go.
<<
|
|
 |
|
|
Paul Smith gets the edging just right while Bill Sherwood runs the Bull Float to smooth things out
>>
|
|
|
|
 |
|
|
Construction begins on the tower next to the studio.
<<
|
|
 |
|
|
Another 55 yards of concrete go into the base of the tower.
>>
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|